Once I hit my 40s, massive home diy projects have either become necessities (too expensive to hire out), pipe dreams, or like PA DOT working on route 202 in my youth (never ending with incremental steps that never improve the experience of driving). The energy loss is off the hook, and I’m not a flubbynutter.
Once I hit my 40s, massive home diy projects have either become necessities (too expensive to hire out), pipe dreams, or like PA DOT working on route 202 in my youth (never ending with incremental steps that never improve the experience of driving). The energy loss is off the hook, and I’m not a flubbynutter.